Build-Up and Dismantle Scheduling at European Exhibition Venues
Correction Logistics Setup

Build-Up and Dismantle Scheduling at European Exhibition Venues

Corrected by Utku Kavakli · on Exhibition Stands EU · 16 July 2026 · View published page ↗

The build-up window at a tier-one European fair is a finite resource with hard hand-back deadlines and EUR 1,000-3,000 per day overrun penalties.

The exact change

Before

- AUMA exhibitor manual (2024-2026 edition), Association of the German Trade Fair Industry, [auma.de](https://www.auma.de)

After

- AUMA, "Successful Trade Fair Participation" guide, Association of the German Trade Fair Industry, [auma.de](https://www.auma.de)

Suggested change

- AUMA, "Successful Trade Fair Participation" guide, Association of the German Trade Fair Industry, [auma.de](https://www.auma.de)

Why this is better

2 issues fixed: AUMA does not publish a document called an 'exhibitor manual' - this is an unverified title for a citation. | FAMAB Verband Direkte Wirtschaftskommunikation is an outdated organization name; it rebranded in 2021 to 'fwd: Bundesvereinigung Veranstaltungswirtschaft e.V.' and famab.de now redirects to forward.live.